Cutlass Solar Phase I and Phase II
Booth, TX
Five-S Group performed all civil scopes for the development of Cutlass solar Phase 1, developing about 750 Acres for solar panel energy generation. Our activities included:
Clearing and grubbing
Access roads to and throughout the site
Drainage
Dewatering
Cut-to-fill mass grading
Soil stabilization
Installation of silt fencing
Pile installation
Laydown areas
All-access and travel areas were completed using a geogrid geotextile and limestone surfacing.
Five S performed all civil scope work for the development of Cutlass Solar Phase II, developing 1125 acres for solar panel energy generation.
Clearing and grubbing
Installation of silt fencing
Installation of Baselock fabgrid
Access to and throughout the site
Dewatering
Drainage to include rip rap installation, stripping and re-spreading
Cut-to-fill mass grading, lime soil stabilization and installation of AC, FO, bare ground wiring and power junction boxes.