Cutlass Solar Phase I and Phase II

Booth, TX

Five-S Group performed all civil scopes for the development of Cutlass solar Phase 1, developing about 750 Acres for solar panel energy generation.  Our activities included:

  • Clearing and grubbing

  • Access roads to and throughout the site

  • Drainage

  • Dewatering

  • Cut-to-fill mass grading

  • Soil stabilization

  • Installation of silt fencing

  • Pile installation

  • Laydown areas

  • All-access and travel areas were completed using a geogrid geotextile and limestone surfacing.

Five S performed all civil scope work for the development of Cutlass Solar Phase II, developing 1125 acres for solar panel energy generation.

  • Clearing and grubbing

  • Installation of silt fencing

  • Installation of Baselock fabgrid

  • Access to and throughout the site

  • Dewatering

  • Drainage to include rip rap installation, stripping and re-spreading

  • Cut-to-fill mass grading, lime soil stabilization and installation of AC, FO, bare ground wiring and power junction boxes.