Gulf Coast LNG Export Facility | Ship Berth Construction
Port Arthur, TX
Five-S Group’s scope of work spanned nearly 80 acres of this LNG ship berth project site. The scope of work was considered high risk with a challenging schedule for dredging to start in order to meet the project's critical path requirements. As a result of our efforts on this project, Five-S Group was awarded a Merit Award for Excellence In Construction from the Associated Builders and Contractors Organization - Pelican Chapter. The project was completed on-schedule, within budget, and over 11,000 man-hours were worked with zero lost time incidents or injuries. The scope of work included:
Installation of silt fencing
Limestone base, concrete slab and coatings
Stripping of topsoil
Mass excavation of perimeter pilot cut
Removal of shoreline sheet piles, riprap, concrete
Removal of the HWY 87 roadway and subgrade material
Supply, installation, and mobilization of all heavy earthmoving equipment, hard barricades, signage, and lighting