CORTEC Crude Terminal

PORT ALLEN, LA

Five-S was awarded contracts for the site work for the construction of a new liquid gas transfer facility for ExxonMobil’s Port Allen, Louisiana location. The facility will be used to upload petroleum products from 18-wheel tank trucks, store them and pump them through a 6-inch pipeline. Five-S’ scope of work included clearing and grubbing, stripping, excavation and embankment, structural fill import and install, drainage and unsuitable soils removal.